Elevator installation or upgrade · Milvignes

Elevator installation or upgrade in Milvignes

Indicative price, tips, grants and companies for your project in Milvignes (Neuchâtel).
Elevator installation or upgrade – Milvignes

At a glance

Typical budget
CHF 58'000 – CHF 143'200
Midpoint
CHF 94'500
Grants found
0
Nearby companies
4

Worked examples in Milvignes

Small project

CHF 46'400 – CHF 114'600

Typical project

CHF 58'000 – CHF 143'200

Large project

CHF 81'100 – CHF 200'500

ProjectQuantityLowHigh
Small project3 CHF 46'400CHF 114'600
Typical project5 CHF 58'000CHF 143'200
Large project9 CHF 81'100CHF 200'500

Computed with our estimator for Milvignes (regional factor included), standard finish. Only the project size changes.

Cost split (typical project)

  • Labour : CHF 37'800 (40 %)
  • Materials : CHF 47'300 (50 %)
  • Other costs : CHF 9'500 (10 %)

What the price covers

Included

  • Supply and installation
  • VAT
  • Drive, car, landing doors and commissioning

Not included

  • Permits and architect fees
  • Unexpected structural issues
  • Possible subsidies
  • Building permit, special foundations, maintenance contract

Tips before you start

  • The number of stops and any new shaft are the main cost drivers.
  • Adding an elevator to an existing building requires a building permit.
  • Include the annual maintenance contract when comparing quotes.

Your project in 5 steps

  1. 1. Estimate

    Set a budget range with the estimator.

  2. 2. Grants

    Apply before work starts.

  3. 3. Quotes

    Compare at least 3 quotes.

  4. 4. Permit

    Check with the municipality whether a permit is needed.

  5. 5. Works

    Follow the site and do a written handover.

Grants and subsidies

No specific grant listed for this work. Maintenance tax deductions may still apply.

Milvignes's housing stock in figures

The federal building register lists 1'788 residential buildings with 4'730 dwellings in Milvignes. 63% were built before 1980, before serious insulation standards, and 73% are still heated with oil or gas.

73% of buildings were built before 1990: an asbestos survey is then required before any demolition. A typical dwelling here measures 94 m².

63 %built before 1980
73 %heated by oil or gas
5.8 %electric hot water
15.7 %with declared solar thermal

Age of residential buildings

  • Before 191921 %
  • 1919–19458 %
  • 1946–196012 %
  • 1961–197013 %
  • 1971–19809 %
  • 1981–199010 %
  • 1991–20008 %
  • 2001–20109 %
  • Since 201110 %

Main heating energy

  • Gas42 %
  • Heating oil31 %
  • Heat pump16 %
  • District heating7 %
  • Wood2 %
  • Electricity1 %
  • Solar thermal1 %

Houses or apartment buildings?

  • Single-family houses60.8 %
  • Two-dwelling houses12 %
  • Apartment buildings (3+)27.2 %
  • Other0.1 %

8.9 % of buildings mix housing with shops or offices.

The typical building

storeys (median)
3
median footprint
136 m²
median dwelling area
94 m²

Renovations, heritage and volumes

When planning renovations in Milvignes, official RegBL data provides essential context for your project. With 4 buildings under heritage protection identified from 94 known records, owners should contact local authorities early to discuss permit requirements. The median house volume is 702 m3 for 1087 properties, a key figure for estimating insulation or heating upgrade costs. Please note that data coverage is partial; only 33 buildings have volume measurements based on the SIA 416 standard, and there is no recorded data available regarding renovation years. Always verify these structural details to ensure accurate budget planning for your specific home.

4
buildings flagged as protected
status known for 94 of 1'788 buildings; check with the municipality
702 m³
median house volume (SIA 416)
measured for 33 of 1'087 houses

Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.

Companies in the area

SOS Menuiserie, Camuso

2017 Boudry · about 4.7 km

SOS Menuiserie provides interior carpentry and complete facility management services including technical maintenance, floor care, and green space upkeep in Boudry.

sosmenuiserie.ch

Edifice LF Sàrl

2300 La Chaux-de-Fonds · about 16.9 km

Specialist in timber framing, carpentry, and innovative structures such as CLT buildings and wooden elevator shafts.

edifice-bois.ch

AS Ascenseurs SA

2300 La Chaux-de-Fonds · about 16.9 km

AS Aufzüge provides planning, construction, maintenance, and repair services for various types of elevators throughout Switzerland.

lift.ch

Edifice LF Sàrl

2333 La Ferrière · about 19.3 km

Edifice LF Sàrl specializes in timber frame construction, carpentry, joinery, and the realization of bespoke timber structures.

edifice-bois.ch

Suggestions from the commercial register by distance and activity. Not an endorsement or partnership.

Useful local data

Rules of the canton of Neuchâtel

These rules apply across the whole canton, not only in this town.

Permits

  • Competent authority : autorité communale ou cantonale compétente (pour l'annonce solaire)
  • Typical delay : environ 20 jours (pour les installations solaires soumises à annonce)
  • Solar panels : La procédure d'annonce remplace déjà le permis de construire classique pour les installations solaires 'suffisamment adaptées' posées sur un toit, dans la zone à bâtir et hors des zones ou objets protégés définis par le droit cantonal. Une simple annonce à l'autorité communale ou cantonale compétente suffit, en général une vingtaine de jours avant le début des travaux.

Source : azprojet.ch

Other works in Milvignes

Elevator installation or upgrade in nearby towns