Heat pump installation · Milvignes

Heat pump installation in Milvignes

Indicative price, tips, grants and companies for your project in Milvignes (Neuchâtel).
Heat pump installation – Milvignes

At a glance

Typical budget
CHF 37'800 – CHF 70'500
Midpoint
CHF 52'900
Grants found
1
Nearby companies
4

Worked examples in Milvignes

Small project

CHF 30'000 – CHF 54'800

Typical project

CHF 37'800 – CHF 70'500

Large project

CHF 49'600 – CHF 93'900

ProjectQuantityLowHigh
Small project80 m²CHF 30'000CHF 54'800
Typical project160 m²CHF 37'800CHF 70'500
Large project280 m²CHF 49'600CHF 93'900

Computed with our estimator for Milvignes (regional factor included), standard finish. Only the project size changes.

Cost split (typical project)

  • Labour : CHF 21'200 (40 %)
  • Materials : CHF 26'500 (50 %)
  • Other costs : CHF 5'300 (10 %)

What the price covers

Included

  • Supply and installation
  • VAT
  • Heat pump and standard connections; removal and equipment only according to answers

Not included

  • Permits and architect fees
  • Unexpected structural issues
  • Possible subsidies
  • Drilling beyond 150 m, buried or contaminated tank, asbestos, insulation and new finishes
  • With air-to-air: hot water and ducts only if selected; adaptations beyond the options excluded

Tips before you start

  • First check whether your area can connect to a priority district heating network.
  • The local design outdoor temperature sets the heat pump's capacity.
  • Outdoor air-water heat pumps must meet noise limits towards neighbours.

Your project in 5 steps

  1. 1. Estimate

    Set a budget range with the estimator.

  2. 2. Grants

    Apply before work starts.

  3. 3. Quotes

    Compare at least 3 quotes.

  4. 4. Permit

    Check with the municipality whether a permit is needed.

  5. 5. Works

    Follow the site and do a written handover.

Grants and subsidies

Canton

Heat pump grant — Neuchâtel

Variable contributions; check conditions with the cantonal energy service.

Neuchâtel cantonal support for renewable heating, in addition to the Buildings Programme.

www.leprogrammebatiments.ch

Check amounts and conditions with the provider before signing: apply before work starts in most cases.

Milvignes's housing stock in figures

The federal building register lists 1'788 residential buildings with 4'730 dwellings in Milvignes. 63% were built before 1980, before serious insulation standards, and 73% are still heated with oil or gas.

With 73% fossil heating and 5.8% electrically heated hot water, many buildings in Milvignes will need a new system. Planning ahead avoids deciding under pressure after a breakdown.

63 %built before 1980
73 %heated by oil or gas
5.8 %electric hot water
15.7 %with declared solar thermal

Age of residential buildings

  • Before 191921 %
  • 1919–19458 %
  • 1946–196012 %
  • 1961–197013 %
  • 1971–19809 %
  • 1981–199010 %
  • 1991–20008 %
  • 2001–20109 %
  • Since 201110 %

Main heating energy

  • Gas42 %
  • Heating oil31 %
  • Heat pump16 %
  • District heating7 %
  • Wood2 %
  • Electricity1 %
  • Solar thermal1 %

Heating and hot water: which energies?

EnergyHeatingHot water
Gas42 %32.5 %
Heating oil31 %28.1 %
District heating7 %6.3 %
Heat pump16 %12.5 %
Electricity1 %5.8 %
Wood2 %0.9 %
Solar thermal1 %13.5 %

Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.

Type of heating system

  • Boiler (unspecified)68.8 %
  • Heat pump16.2 %
  • Heat exchanger (district)6.8 %
  • Condensing boiler5.7 %
  • Stove1 %

A standard non-condensing boiler is usually older and less efficient.

Renovations, heritage and volumes

When planning renovations in Milvignes, official RegBL data provides essential context for your project. With 4 buildings under heritage protection identified from 94 known records, owners should contact local authorities early to discuss permit requirements. The median house volume is 702 m3 for 1087 properties, a key figure for estimating insulation or heating upgrade costs. Please note that data coverage is partial; only 33 buildings have volume measurements based on the SIA 416 standard, and there is no recorded data available regarding renovation years. Always verify these structural details to ensure accurate budget planning for your specific home.

4
buildings flagged as protected
status known for 94 of 1'788 buildings; check with the municipality
702 m³
median house volume (SIA 416)
measured for 33 of 1'087 houses

Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.

Companies in the area

Jacot SA

2012 Auvernier · about 1.6 km

Jacot SA specializes in the design, installation, maintenance, and repair of heating, ventilation, air conditioning, and sanitary systems.

jacot-chauffage.ch

Käslin Chauffage SA

2035 Corcelles NE · about 2.6 km

Neuchâtel-based company specialized in heating and sanitary installations since 1960.

kaslin.ch

Käslin Sanitaire SA

2035 Corcelles NE · about 2.6 km

Neuchâtel-based company specialized in sanitary installations, heating, and building technical systems since 1960.

kaslin.ch

Caloritec SA

2035 Corcelles NE · about 2.6 km

Caloritec is a company specializing in the design, installation, and maintenance of HVAC equipment and energy systems.

caloritec.ch

Suggestions from the commercial register by distance and activity. Not an endorsement or partnership.

Useful local data

Rules of the canton of Neuchâtel

These rules apply across the whole canton, not only in this town.

Fossil heating rules

  • Note : Toute installation de chauffage remplacée doit être annoncée à l'aide de l'outil GAPE (Gestion des Autorisations pour les installations de Production d'Énergie). Un programme de conseil incitatif gratuit « Chauffez renouvelable » est recommandé pour le changement de système de chauffage.
  • Legal basis : Loi cantonale sur l'énergie (LCEn)
  • In force since : 1er mai 2021
  • Heating replacement : Le remplacement de la production de chaleur fossile dans les bâtiments d'habitation devra se faire par des énergies renouvelables lors du changement de chaudière, lorsque c'est techniquement possible et que ceci n'engendre pas de surcoût. Les chauffages électriques fixes à résistance devront être remplacés d'ici 2030.
  • Renewable share required : Une part d'énergie renouvelable d'au moins 20% devra être respectée. Les systèmes à énergies renouvelables qui répondent aux exigences sans obligation de mesures supplémentaires incluent : chauffage au bois comme producteur principal de chaleur et part d'énergies renouvelables pour la production d'eau chaude sanitaire ; pompe à chaleur électrique pour le chauffage et l'eau chaude sanitaire toute l'année ; raccordement à un réseau avec chaleur provenant d'une usine d'incinération d'ordures, d'une STEP, d'énergies renouvelables ou de rejets thermiques (part d'énergie fossile <= 50%).

Source : ne.ch

Tax deductions

  • Carry-forward : Seule la part des frais d'investissement destinés à économiser l'énergie et à ménager l'environnement ainsi que les frais de démolition en vue d'une construction de remplacement, qui n'a pas pu être déduite l'année de facturation (année N) car elle aurait engendré un revenu net négatif, peut être reportée sur les deux années fiscales suivantes (N+1 et N+2). Ces frais doivent avoir été intégralement déclarés l'année de leur facturation. Si des frais sont reportés, la déduction forfaitaire n'est pas possible pour l'immeuble concerné pour la période fiscale correspondante. Le droit de reporter est réservé au propriétaire ayant supporté les frais. L'Intendance des impôts détermine d'office les frais reportables.
  • Flat rate deduction : 10% du rendement brut des loyers ou de la valeur locative (max. 7 200 CHF) si l'âge du bâtiment est inférieur ou égal à dix ans; 20% du rendement brut des loyers ou de la valeur locative (max. 12 000 CHF) si l'âge du bâtiment est supérieur à dix ans. Aucune autre déduction supplémentaire n'est possible avec le forfait. Les propriétaires d'immeubles commerciaux affectés à leur activité indépendante ne peuvent pas opter pour la déduction forfaitaire pour ces immeubles, mais c'est possible pour d'autres immeubles de leur fortune privée.
  • Maintenance costs : Le/la contribuable peut choisir, lors de chaque période fiscale et pour chaque immeuble, entre la déduction des frais effectifs et la déduction forfaitaire. Les frais effectifs déductibles sont ceux visant à maintenir la valeur de l'immeuble, facturés durant l'année de calcul. Si les dépenses comportent des dépenses d’entretien, d’amélioration et/ou d’économies d’énergie, une répartition par nature est nécessaire selon un catalogue de répartition.
  • Energy investments : Les investissements destinés à économiser l’énergie et à ménager l’environnement (remplacement d'éléments vétustes ou adjonction d'éléments/installations dans les bâtiments existants) sont déductibles. Ces frais peuvent être reportés sur les deux années fiscales suivantes s'ils n'ont pas pu être déduits intégralement l'année de facturation (N, N+1, N+2).

Source : SCCO_I772_Notice4_PP.pdf

Permits

  • Competent authority : autorité communale ou cantonale compétente (pour l'annonce solaire)
  • Typical delay : environ 20 jours (pour les installations solaires soumises à annonce)
  • Solar panels : La procédure d'annonce remplace déjà le permis de construire classique pour les installations solaires 'suffisamment adaptées' posées sur un toit, dans la zone à bâtir et hors des zones ou objets protégés définis par le droit cantonal. Une simple annonce à l'autorité communale ou cantonale compétente suffit, en général une vingtaine de jours avant le début des travaux.

Source : azprojet.ch