Heat pump installation · Boudry

Heat pump installation in Boudry

Indicative price, tips, grants and companies for your project in Boudry (Neuchâtel).
Heat pump installation – Boudry

At a glance

Typical budget
CHF 37'800 – CHF 70'500
Midpoint
CHF 52'900
Grants found
1
Nearby companies
4

Worked examples in Boudry

Small project

CHF 30'000 – CHF 54'800

Typical project

CHF 37'800 – CHF 70'500

Large project

CHF 49'600 – CHF 93'900

ProjectQuantityLowHigh
Small project80 m²CHF 30'000CHF 54'800
Typical project160 m²CHF 37'800CHF 70'500
Large project280 m²CHF 49'600CHF 93'900

Computed with our estimator for Boudry (regional factor included), standard finish. Only the project size changes.

Cost split (typical project)

  • Labour : CHF 21'200 (40 %)
  • Materials : CHF 26'500 (50 %)
  • Other costs : CHF 5'300 (10 %)

What the price covers

Included

  • Supply and installation
  • VAT
  • Heat pump and standard connections; removal and equipment only according to answers

Not included

  • Permits and architect fees
  • Unexpected structural issues
  • Possible subsidies
  • Drilling beyond 150 m, buried or contaminated tank, asbestos, insulation and new finishes
  • With air-to-air: hot water and ducts only if selected; adaptations beyond the options excluded

Tips before you start

  • First check whether your area can connect to a priority district heating network.
  • The local design outdoor temperature sets the heat pump's capacity.
  • Outdoor air-water heat pumps must meet noise limits towards neighbours.

Your project in 5 steps

  1. 1. Estimate

    Set a budget range with the estimator.

  2. 2. Grants

    Apply before work starts.

  3. 3. Quotes

    Compare at least 3 quotes.

  4. 4. Permit

    Check with the municipality whether a permit is needed.

  5. 5. Works

    Follow the site and do a written handover.

Grants and subsidies

Canton

Heat pump grant — Neuchâtel

Variable contributions; check conditions with the cantonal energy service.

Neuchâtel cantonal support for renewable heating, in addition to the Buildings Programme.

www.leprogrammebatiments.ch

Check amounts and conditions with the provider before signing: apply before work starts in most cases.

Boudry's housing stock in figures

The federal building register lists 832 residential buildings with 3'075 dwellings in Boudry. 62% were built before 1980, before serious insulation standards, and 71% are still heated with oil or gas.

With 71% fossil heating and 6.7% electrically heated hot water, many buildings in Boudry will need a new system. Planning ahead avoids deciding under pressure after a breakdown.

62 %built before 1980
71 %heated by oil or gas
6.7 %electric hot water
12.1 %with declared solar thermal

Age of residential buildings

  • Before 191926 %
  • 1919–19457 %
  • 1946–196010 %
  • 1961–197012 %
  • 1971–19807 %
  • 1981–199020 %
  • 1991–20003 %
  • 2001–20104 %
  • Since 201112 %

Main heating energy

  • Gas37 %
  • Heating oil34 %
  • Heat pump17 %
  • District heating7 %
  • Wood3 %
  • Electricity2 %

Heating and hot water: which energies?

EnergyHeatingHot water
Gas37 %34.1 %
Heating oil34 %31.6 %
District heating7 %5.8 %
Heat pump17 %10.4 %
Electricity2 %6.7 %
Wood3 %1.2 %
Solar thermal0 %10.2 %

Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.

Type of heating system

  • Boiler (unspecified)66 %
  • Heat pump16.8 %
  • Heat exchanger (district)6.6 %
  • Condensing boiler5.8 %
  • Central electric heating2.4 %
  • Stove2 %

A standard non-condensing boiler is usually older and less efficient.

Renovations, heritage and volumes

For your renovation plans in Boudry, RegBL figures identify heritage protection, although data coverage is partial with only 28 out of 832 buildings officially recorded; consult the municipality early regarding permits. The median house volume is 584 m3 based on SIA 416, though this represents a sample of only 15 out of 463 houses. These metrics define the scale of your heating and insulation works. Consider these specific figures when estimating your costs to ensure a smooth planning process and to align your renovation scope with the local building standards applicable to your property.

2
buildings flagged as protected
status known for 28 of 832 buildings; check with the municipality
584 m³
median house volume (SIA 416)
measured for 15 of 463 houses

Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.

Companies in the area

Groupe E Entretec SA

2017 Boudry · about 0 km

Groupe E Entretec SA provides installation and maintenance services for heating systems, heat pumps, and photovoltaic installations.

groupe-e.ch

Groupe E Arc SA

2017 Boudry · about 0 km

Groupe E Arc SA carries out electrical installations and energy-related technical work, while the Groupe E website also presents district heating connections.

groupe-e.ch

swisspro SR SA

2014 Bôle · about 2.5 km

swisspro is a company specializing in electrical installations, charging infrastructure for electric vehicles, and intelligent building automation solutions.

swisspro.ch

J.M. Lambelet SA

2022 Bevaix · about 3.4 km

Neuchâtel-based company specializing in heating, ventilation, air conditioning, plumbing, and photovoltaic installations.

jmlambelet-sa.ch

Suggestions from the commercial register by distance and activity. Not an endorsement or partnership.

Useful local data

Rules of the canton of Neuchâtel

These rules apply across the whole canton, not only in this town.

Fossil heating rules

  • Note : Toute installation de chauffage remplacée doit être annoncée à l'aide de l'outil GAPE (Gestion des Autorisations pour les installations de Production d'Énergie). Un programme de conseil incitatif gratuit « Chauffez renouvelable » est recommandé pour le changement de système de chauffage.
  • Legal basis : Loi cantonale sur l'énergie (LCEn)
  • In force since : 1er mai 2021
  • Heating replacement : Le remplacement de la production de chaleur fossile dans les bâtiments d'habitation devra se faire par des énergies renouvelables lors du changement de chaudière, lorsque c'est techniquement possible et que ceci n'engendre pas de surcoût. Les chauffages électriques fixes à résistance devront être remplacés d'ici 2030.
  • Renewable share required : Une part d'énergie renouvelable d'au moins 20% devra être respectée. Les systèmes à énergies renouvelables qui répondent aux exigences sans obligation de mesures supplémentaires incluent : chauffage au bois comme producteur principal de chaleur et part d'énergies renouvelables pour la production d'eau chaude sanitaire ; pompe à chaleur électrique pour le chauffage et l'eau chaude sanitaire toute l'année ; raccordement à un réseau avec chaleur provenant d'une usine d'incinération d'ordures, d'une STEP, d'énergies renouvelables ou de rejets thermiques (part d'énergie fossile <= 50%).

Source : ne.ch

Tax deductions

  • Carry-forward : Seule la part des frais d'investissement destinés à économiser l'énergie et à ménager l'environnement ainsi que les frais de démolition en vue d'une construction de remplacement, qui n'a pas pu être déduite l'année de facturation (année N) car elle aurait engendré un revenu net négatif, peut être reportée sur les deux années fiscales suivantes (N+1 et N+2). Ces frais doivent avoir été intégralement déclarés l'année de leur facturation. Si des frais sont reportés, la déduction forfaitaire n'est pas possible pour l'immeuble concerné pour la période fiscale correspondante. Le droit de reporter est réservé au propriétaire ayant supporté les frais. L'Intendance des impôts détermine d'office les frais reportables.
  • Flat rate deduction : 10% du rendement brut des loyers ou de la valeur locative (max. 7 200 CHF) si l'âge du bâtiment est inférieur ou égal à dix ans; 20% du rendement brut des loyers ou de la valeur locative (max. 12 000 CHF) si l'âge du bâtiment est supérieur à dix ans. Aucune autre déduction supplémentaire n'est possible avec le forfait. Les propriétaires d'immeubles commerciaux affectés à leur activité indépendante ne peuvent pas opter pour la déduction forfaitaire pour ces immeubles, mais c'est possible pour d'autres immeubles de leur fortune privée.
  • Maintenance costs : Le/la contribuable peut choisir, lors de chaque période fiscale et pour chaque immeuble, entre la déduction des frais effectifs et la déduction forfaitaire. Les frais effectifs déductibles sont ceux visant à maintenir la valeur de l'immeuble, facturés durant l'année de calcul. Si les dépenses comportent des dépenses d’entretien, d’amélioration et/ou d’économies d’énergie, une répartition par nature est nécessaire selon un catalogue de répartition.
  • Energy investments : Les investissements destinés à économiser l’énergie et à ménager l’environnement (remplacement d'éléments vétustes ou adjonction d'éléments/installations dans les bâtiments existants) sont déductibles. Ces frais peuvent être reportés sur les deux années fiscales suivantes s'ils n'ont pas pu être déduits intégralement l'année de facturation (N, N+1, N+2).

Source : SCCO_I772_Notice4_PP.pdf

Permits

  • Competent authority : autorité communale ou cantonale compétente (pour l'annonce solaire)
  • Typical delay : environ 20 jours (pour les installations solaires soumises à annonce)
  • Solar panels : La procédure d'annonce remplace déjà le permis de construire classique pour les installations solaires 'suffisamment adaptées' posées sur un toit, dans la zone à bâtir et hors des zones ou objets protégés définis par le droit cantonal. Une simple annonce à l'autorité communale ou cantonale compétente suffit, en général une vingtaine de jours avant le début des travaux.

Source : azprojet.ch

Other works in Boudry

Heat pump installation in nearby towns