Roof renovation · Boudry

Roof renovation in Boudry

Indicative price, tips, grants and companies for your project in Boudry (Neuchâtel).
Roof renovation – Boudry

At a glance

Typical budget
CHF 27'000 – CHF 59'500
Midpoint
CHF 40'800
Grants found
1
Nearby companies
4

Worked examples in Boudry

Small project

CHF 14'900 – CHF 34'200

Typical project

CHF 27'000 – CHF 59'500

Large project

CHF 45'100 – CHF 97'400

ProjectQuantityLowHigh
Small project70 m²CHF 14'900CHF 34'200
Typical project140 m²CHF 27'000CHF 59'500
Large project245 m²CHF 45'100CHF 97'400

Computed with our estimator for Boudry (regional factor included), standard finish. Only the project size changes.

Cost split (typical project)

  • Labour : CHF 20'400 (50 %)
  • Materials : CHF 16'300 (40 %)
  • Other costs : CHF 4'100 (10 %)

What the price covers

Included

  • Supply and installation
  • VAT
  • Covering, scaffolding, insulation and removal according to answers

Not included

  • Permits and architect fees
  • Unexpected structural issues
  • Possible subsidies
  • New roof structure, asbestos, roof windows and structural reinforcement

Tips before you start

  • Insulating the roof together with the covering is often eligible for the Buildings Programme.
  • Existing solar panels must be removed and refitted: budget for it.
  • At altitude, snow loads and frost influence material choice.

Your project in 5 steps

  1. 1. Estimate

    Set a budget range with the estimator.

  2. 2. Grants

    Apply before work starts.

  3. 3. Quotes

    Compare at least 3 quotes.

  4. 4. Permit

    Check with the municipality whether a permit is needed.

  5. 5. Works

    Follow the site and do a written handover.

Grants and subsidies

Canton

Facade insulation — Neuchâtel

Per cantonal schedule.

Neuchâtel grants for energy renovation of the building envelope.

www.leprogrammebatiments.ch

Check amounts and conditions with the provider before signing: apply before work starts in most cases.

Boudry's housing stock in figures

The federal building register lists 832 residential buildings with 3'075 dwellings in Boudry. 62% were built before 1980, before serious insulation standards, and 71% are still heated with oil or gas.

Only 12.1% of residential buildings in Boudry report a solar thermal system in the register, so most roofs are still free. Photovoltaics are not recorded there; check the solar cadastre for your roof.

62 %built before 1980
71 %heated by oil or gas
6.7 %electric hot water
12.1 %with declared solar thermal

Age of residential buildings

  • Before 191926 %
  • 1919–19457 %
  • 1946–196010 %
  • 1961–197012 %
  • 1971–19807 %
  • 1981–199020 %
  • 1991–20003 %
  • 2001–20104 %
  • Since 201112 %

Main heating energy

  • Gas37 %
  • Heating oil34 %
  • Heat pump17 %
  • District heating7 %
  • Wood3 %
  • Electricity2 %

Heating and hot water: which energies?

EnergyHeatingHot water
Gas37 %34.1 %
Heating oil34 %31.6 %
District heating7 %5.8 %
Heat pump17 %10.4 %
Electricity2 %6.7 %
Wood3 %1.2 %
Solar thermal0 %10.2 %

Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.

Type of heating system

  • Boiler (unspecified)66 %
  • Heat pump16.8 %
  • Heat exchanger (district)6.6 %
  • Condensing boiler5.8 %
  • Central electric heating2.4 %
  • Stove2 %

A standard non-condensing boiler is usually older and less efficient.

Houses or apartment buildings?

  • Single-family houses55.6 %
  • Two-dwelling houses12 %
  • Apartment buildings (3+)32.3 %

11.9 % of buildings mix housing with shops or offices.

The typical building

storeys (median)
3
median footprint
138 m²
median dwelling area
88 m²

Renovations, heritage and volumes

For your renovation plans in Boudry, RegBL figures identify heritage protection, although data coverage is partial with only 28 out of 832 buildings officially recorded; consult the municipality early regarding permits. The median house volume is 584 m3 based on SIA 416, though this represents a sample of only 15 out of 463 houses. These metrics define the scale of your heating and insulation works. Consider these specific figures when estimating your costs to ensure a smooth planning process and to align your renovation scope with the local building standards applicable to your property.

2
buildings flagged as protected
status known for 28 of 832 buildings; check with the municipality
584 m³
median house volume (SIA 416)
measured for 15 of 463 houses

Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.

Companies in the area

Gottburg SA

2017 Boudry · about 0 km

Gottburg SA provides roofing, sheet metal work, waterproofing, ventilated façades and photovoltaic installations for new construction and renovation projects in the Neuchâtel region.

gottburg.ch

Audétat Ferblanterie Sàrl

2019 Rochefort · about 3 km

Audétat Ferblanterie Sàrl is a Rochefort-based company specializing in sheet metal work, roofing, and roof window installation.

audetat-ferblanterie.ch

VALENTIN FRANCEY

2022 Bevaix · about 3.4 km

Valentin Francey specializes in carpentry and artisanal joinery work.

valentinfrancey.ch

Ortlieb & Hirschy Sanitaire SA

2016 Cortaillod · about 4.3 km

Ortlieb & Hirschy Sanitaire SA in Cortaillod carries out sanitary installations and building sheet metal work, with attention to water savings and environmentally friendly materials.

ortliebhirschy.ch

Suggestions from the commercial register by distance and activity. Not an endorsement or partnership.

Useful local data

Rules of the canton of Neuchâtel

These rules apply across the whole canton, not only in this town.

Permits

  • Competent authority : autorité communale ou cantonale compétente (pour l'annonce solaire)
  • Typical delay : environ 20 jours (pour les installations solaires soumises à annonce)
  • Solar panels : La procédure d'annonce remplace déjà le permis de construire classique pour les installations solaires 'suffisamment adaptées' posées sur un toit, dans la zone à bâtir et hors des zones ou objets protégés définis par le droit cantonal. Une simple annonce à l'autorité communale ou cantonale compétente suffit, en général une vingtaine de jours avant le début des travaux.

Source : azprojet.ch

Tax deductions

  • Carry-forward : Seule la part des frais d'investissement destinés à économiser l'énergie et à ménager l'environnement ainsi que les frais de démolition en vue d'une construction de remplacement, qui n'a pas pu être déduite l'année de facturation (année N) car elle aurait engendré un revenu net négatif, peut être reportée sur les deux années fiscales suivantes (N+1 et N+2). Ces frais doivent avoir été intégralement déclarés l'année de leur facturation. Si des frais sont reportés, la déduction forfaitaire n'est pas possible pour l'immeuble concerné pour la période fiscale correspondante. Le droit de reporter est réservé au propriétaire ayant supporté les frais. L'Intendance des impôts détermine d'office les frais reportables.
  • Flat rate deduction : 10% du rendement brut des loyers ou de la valeur locative (max. 7 200 CHF) si l'âge du bâtiment est inférieur ou égal à dix ans; 20% du rendement brut des loyers ou de la valeur locative (max. 12 000 CHF) si l'âge du bâtiment est supérieur à dix ans. Aucune autre déduction supplémentaire n'est possible avec le forfait. Les propriétaires d'immeubles commerciaux affectés à leur activité indépendante ne peuvent pas opter pour la déduction forfaitaire pour ces immeubles, mais c'est possible pour d'autres immeubles de leur fortune privée.
  • Maintenance costs : Le/la contribuable peut choisir, lors de chaque période fiscale et pour chaque immeuble, entre la déduction des frais effectifs et la déduction forfaitaire. Les frais effectifs déductibles sont ceux visant à maintenir la valeur de l'immeuble, facturés durant l'année de calcul. Si les dépenses comportent des dépenses d’entretien, d’amélioration et/ou d’économies d’énergie, une répartition par nature est nécessaire selon un catalogue de répartition.
  • Energy investments : Les investissements destinés à économiser l’énergie et à ménager l’environnement (remplacement d'éléments vétustes ou adjonction d'éléments/installations dans les bâtiments existants) sont déductibles. Ces frais peuvent être reportés sur les deux années fiscales suivantes s'ils n'ont pas pu être déduits intégralement l'année de facturation (N, N+1, N+2).

Source : SCCO_I772_Notice4_PP.pdf

Other works in Boudry

Roof renovation in nearby towns