Window replacement – Milvignes

At a glance

Typical budget
CHF 7'100 – CHF 17'100
Midpoint
CHF 11'500
Grants found
1
Nearby companies
4

Worked examples in Milvignes

Small project

CHF 4'600 – CHF 11'600

Typical project

CHF 7'100 – CHF 17'100

Large project

CHF 12'800 – CHF 29'900

ProjectQuantityLowHigh
Small project4 unitsCHF 4'600CHF 11'600
Typical project7 unitsCHF 7'100CHF 17'100
Large project13 unitsCHF 12'800CHF 29'900

Computed with our estimator for Milvignes (regional factor included), standard finish. Only the project size changes.

Cost split (typical project)

  • Labour : CHF 4'000 (35 %)
  • Materials : CHF 6'300 (55 %)
  • Other costs : CHF 1'100 (10 %)

What the price covers

Included

  • Supply and installation
  • VAT
  • Frames, glazing and blinds according to answers, per window size; standard making good

Not included

  • Permits and architect fees
  • Unexpected structural issues
  • Possible subsidies
  • Sliding doors, roof windows, changes to openings

Tips before you start

  • Count your windows by size (small, standard, French doors, bays) for a fairer price.
  • Windows alone are rarely subsidised: grants usually target a full envelope renovation.
  • In protected areas or visible facades, frame shape and colour may be imposed.

Your project in 5 steps

  1. 1. Estimate

    Set a budget range with the estimator.

  2. 2. Grants

    Apply before work starts.

  3. 3. Quotes

    Compare at least 3 quotes.

  4. 4. Permit

    Check with the municipality whether a permit is needed.

  5. 5. Works

    Follow the site and do a written handover.

Grants and subsidies

Canton

Window replacement — Neuchâtel

Per cantonal schedule.

Eligible in Neuchâtel within an energy renovation project.

www.leprogrammebatiments.ch

Check amounts and conditions with the provider before signing: apply before work starts in most cases.

Milvignes's housing stock in figures

The federal building register lists 1'788 residential buildings with 4'730 dwellings in Milvignes. 63% were built before 1980, before serious insulation standards, and 73% are still heated with oil or gas.

With 63% of buildings dating from before 1980, the envelope is often the biggest saving. 72.8% are one- or two-dwelling houses where the owner decides alone; in apartment buildings, plan for a co-owners' decision. Have asbestos and PCB checked first.

63 %built before 1980
73 %heated by oil or gas
5.8 %electric hot water
15.7 %with declared solar thermal

Age of residential buildings

  • Before 191921 %
  • 1919–19458 %
  • 1946–196012 %
  • 1961–197013 %
  • 1971–19809 %
  • 1981–199010 %
  • 1991–20008 %
  • 2001–20109 %
  • Since 201110 %

Main heating energy

  • Gas42 %
  • Heating oil31 %
  • Heat pump16 %
  • District heating7 %
  • Wood2 %
  • Electricity1 %
  • Solar thermal1 %

Houses or apartment buildings?

  • Single-family houses60.8 %
  • Two-dwelling houses12 %
  • Apartment buildings (3+)27.2 %
  • Other0.1 %

8.9 % of buildings mix housing with shops or offices.

The typical building

storeys (median)
3
median footprint
136 m²
median dwelling area
94 m²

Renovations, heritage and volumes

When planning renovations in Milvignes, official RegBL data provides essential context for your project. With 4 buildings under heritage protection identified from 94 known records, owners should contact local authorities early to discuss permit requirements. The median house volume is 702 m3 for 1087 properties, a key figure for estimating insulation or heating upgrade costs. Please note that data coverage is partial; only 33 buildings have volume measurements based on the SIA 416 standard, and there is no recorded data available regarding renovation years. Always verify these structural details to ensure accurate budget planning for your specific home.

4
buildings flagged as protected
status known for 94 of 1'788 buildings; check with the municipality
702 m³
median house volume (SIA 416)
measured for 33 of 1'087 houses

Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.

Companies in the area

FM Stores-Volets Sàrl

2013 Colombier NE · about 0 km

FM Stores-Volets Sàrl specializes in the sale, installation, and motorization of blinds, shutters, insect screens, and garage doors.

fmstores.ch

Comtesse Stores Sàrl

2035 Corcelles NE · about 2.6 km

Comtesse Stores Sàrl specializes in the supply, installation, and repair of internal and external blinds and insect screens.

comtesse-stores.ch

POLE-IMMO SA

2016 Cortaillod · about 3.6 km

General contractor based in Cortaillod specialized in construction, full renovation, and construction management from shell to interior finishing.

pole-immo.ch

Pose Tous Bois S.A.

2016 Cortaillod · about 3.6 km

Joinery company in Cortaillod providing loft conversions, kitchen, flooring, window and terrace installation, as well as residential maintenance.

pose-tous-bois.ch

Suggestions from the commercial register by distance and activity. Not an endorsement or partnership.

Useful local data

Rules of the canton of Neuchâtel

These rules apply across the whole canton, not only in this town.

Permits

  • Competent authority : autorité communale ou cantonale compétente (pour l'annonce solaire)
  • Typical delay : environ 20 jours (pour les installations solaires soumises à annonce)
  • Solar panels : La procédure d'annonce remplace déjà le permis de construire classique pour les installations solaires 'suffisamment adaptées' posées sur un toit, dans la zone à bâtir et hors des zones ou objets protégés définis par le droit cantonal. Une simple annonce à l'autorité communale ou cantonale compétente suffit, en général une vingtaine de jours avant le début des travaux.

Source : azprojet.ch

Tax deductions

  • Carry-forward : Seule la part des frais d'investissement destinés à économiser l'énergie et à ménager l'environnement ainsi que les frais de démolition en vue d'une construction de remplacement, qui n'a pas pu être déduite l'année de facturation (année N) car elle aurait engendré un revenu net négatif, peut être reportée sur les deux années fiscales suivantes (N+1 et N+2). Ces frais doivent avoir été intégralement déclarés l'année de leur facturation. Si des frais sont reportés, la déduction forfaitaire n'est pas possible pour l'immeuble concerné pour la période fiscale correspondante. Le droit de reporter est réservé au propriétaire ayant supporté les frais. L'Intendance des impôts détermine d'office les frais reportables.
  • Flat rate deduction : 10% du rendement brut des loyers ou de la valeur locative (max. 7 200 CHF) si l'âge du bâtiment est inférieur ou égal à dix ans; 20% du rendement brut des loyers ou de la valeur locative (max. 12 000 CHF) si l'âge du bâtiment est supérieur à dix ans. Aucune autre déduction supplémentaire n'est possible avec le forfait. Les propriétaires d'immeubles commerciaux affectés à leur activité indépendante ne peuvent pas opter pour la déduction forfaitaire pour ces immeubles, mais c'est possible pour d'autres immeubles de leur fortune privée.
  • Maintenance costs : Le/la contribuable peut choisir, lors de chaque période fiscale et pour chaque immeuble, entre la déduction des frais effectifs et la déduction forfaitaire. Les frais effectifs déductibles sont ceux visant à maintenir la valeur de l'immeuble, facturés durant l'année de calcul. Si les dépenses comportent des dépenses d’entretien, d’amélioration et/ou d’économies d’énergie, une répartition par nature est nécessaire selon un catalogue de répartition.
  • Energy investments : Les investissements destinés à économiser l’énergie et à ménager l’environnement (remplacement d'éléments vétustes ou adjonction d'éléments/installations dans les bâtiments existants) sont déductibles. Ces frais peuvent être reportés sur les deux années fiscales suivantes s'ils n'ont pas pu être déduits intégralement l'année de facturation (N, N+1, N+2).

Source : SCCO_I772_Notice4_PP.pdf