Elevator installation or upgrade · Val-de-Ruz

Elevator installation or upgrade in Val-de-Ruz

Indicative price, tips, grants and companies for your project in Val-de-Ruz (Neuchâtel).
Elevator installation or upgrade – Val-de-Ruz

At a glance

Typical budget
CHF 58'000 – CHF 143'200
Midpoint
CHF 94'500
Grants found
0
Nearby companies
4

Worked examples in Val-de-Ruz

Small project

CHF 46'400 – CHF 114'600

Typical project

CHF 58'000 – CHF 143'200

Large project

CHF 81'100 – CHF 200'500

ProjectQuantityLowHigh
Small project3 CHF 46'400CHF 114'600
Typical project5 CHF 58'000CHF 143'200
Large project9 CHF 81'100CHF 200'500

Computed with our estimator for Val-de-Ruz (regional factor included), standard finish. Only the project size changes.

Cost split (typical project)

  • Labour : CHF 37'800 (40 %)
  • Materials : CHF 47'300 (50 %)
  • Other costs : CHF 9'500 (10 %)

What the price covers

Included

  • Supply and installation
  • VAT
  • Drive, car, landing doors and commissioning

Not included

  • Permits and architect fees
  • Unexpected structural issues
  • Possible subsidies
  • Building permit, special foundations, maintenance contract

Tips before you start

  • The number of stops and any new shaft are the main cost drivers.
  • Adding an elevator to an existing building requires a building permit.
  • Include the annual maintenance contract when comparing quotes.

Your project in 5 steps

  1. 1. Estimate

    Set a budget range with the estimator.

  2. 2. Grants

    Apply before work starts.

  3. 3. Quotes

    Compare at least 3 quotes.

  4. 4. Permit

    Check with the municipality whether a permit is needed.

  5. 5. Works

    Follow the site and do a written handover.

Grants and subsidies

No specific grant listed for this work. Maintenance tax deductions may still apply.

Val-de-Ruz's housing stock in figures

The federal building register lists 3'879 residential buildings with 8'448 dwellings in Val-de-Ruz. 52% were built before 1980, before serious insulation standards, and 60% are still heated with oil or gas.

63% of buildings were built before 1990: an asbestos survey is then required before any demolition. A typical dwelling here measures 100 m².

52 %built before 1980
60 %heated by oil or gas
9.3 %electric hot water
19.9 %with declared solar thermal

Age of residential buildings

  • Before 191923 %
  • 1919–19455 %
  • 1946–19608 %
  • 1961–19707 %
  • 1971–19809 %
  • 1981–199011 %
  • 1991–200010 %
  • 2001–201014 %
  • Since 201111 %

Main heating energy

  • Heating oil34 %
  • Gas26 %
  • Heat pump24 %
  • Wood10 %
  • District heating3 %
  • Electricity2 %
  • Solar thermal1 %

Houses or apartment buildings?

  • Single-family houses64.2 %
  • Two-dwelling houses14.5 %
  • Apartment buildings (3+)21.3 %
  • Other0 %

12.3 % of buildings mix housing with shops or offices.

The typical building

storeys (median)
2
median footprint
135 m²
median dwelling area
100 m²

Renovations, heritage and volumes

For renovation projects in Val-de-Ruz, official building register data indicates that 4 buildings are heritage-protected. Homeowners should consult municipal authorities early regarding permits if this applies to their property. Additionally, the median volume of 1008 m3 across 2489 houses, measured by SIA 416 standards, helps determine the scale of necessary heating or insulation upgrades. Please be aware that data coverage is partial regarding volumetric measurements for all properties. Furthermore, there is no official data recorded in the register concerning the year of the last renovation for buildings in this municipality.

4
buildings flagged as protected
status known for 153 of 3'879 buildings; check with the municipality
1'008 m³
median house volume (SIA 416)
measured for 2 of 2'489 houses

Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.

Companies in the area

AS Ascenseurs SA

2300 La Chaux-de-Fonds · about 7.4 km

AS Aufzüge provides planning, construction, maintenance, and repair services for various types of elevators throughout Switzerland.

lift.ch

Edifice LF Sàrl

2300 La Chaux-de-Fonds · about 7.4 km

Specialist in timber framing, carpentry, and innovative structures such as CLT buildings and wooden elevator shafts.

edifice-bois.ch

Edifice LF Sàrl

2333 La Ferrière · about 8.7 km

Edifice LF Sàrl specializes in timber frame construction, carpentry, joinery, and the realization of bespoke timber structures.

edifice-bois.ch

SOS Menuiserie, Camuso

2017 Boudry · about 13.6 km

SOS Menuiserie provides interior carpentry and complete facility management services including technical maintenance, floor care, and green space upkeep in Boudry.

sosmenuiserie.ch

Suggestions from the commercial register by distance and activity. Not an endorsement or partnership.

Useful local data

Rules of the canton of Neuchâtel

These rules apply across the whole canton, not only in this town.

Permits

  • Competent authority : autorité communale ou cantonale compétente (pour l'annonce solaire)
  • Typical delay : environ 20 jours (pour les installations solaires soumises à annonce)
  • Solar panels : La procédure d'annonce remplace déjà le permis de construire classique pour les installations solaires 'suffisamment adaptées' posées sur un toit, dans la zone à bâtir et hors des zones ou objets protégés définis par le droit cantonal. Une simple annonce à l'autorité communale ou cantonale compétente suffit, en général une vingtaine de jours avant le début des travaux.

Source : azprojet.ch

Other works in Val-de-Ruz

Elevator installation or upgrade in nearby towns