Heat pump installation · Payerne

Heat pump installation in Payerne

Indicative price, tips, grants and companies for your project in Payerne (Vaud).
Heat pump installation – Payerne

At a glance

Typical budget
CHF 41'600 – CHF 77'500
Midpoint
CHF 58'200
Grants found
1
Nearby companies
4

Worked examples in Payerne

Small project

CHF 32'900 – CHF 60'300

Typical project

CHF 41'600 – CHF 77'500

Large project

CHF 54'600 – CHF 103'300

ProjectQuantityLowHigh
Small project80 m²CHF 32'900CHF 60'300
Typical project160 m²CHF 41'600CHF 77'500
Large project280 m²CHF 54'600CHF 103'300

Computed with our estimator for Payerne (regional factor included), standard finish. Only the project size changes.

Cost split (typical project)

  • Labour : CHF 23'300 (40 %)
  • Materials : CHF 29'100 (50 %)
  • Other costs : CHF 5'800 (10 %)

What the price covers

Included

  • Supply and installation
  • VAT
  • Heat pump and standard connections; removal and equipment only according to answers

Not included

  • Permits and architect fees
  • Unexpected structural issues
  • Possible subsidies
  • Drilling beyond 150 m, buried or contaminated tank, asbestos, insulation and new finishes
  • With air-to-air: hot water and ducts only if selected; adaptations beyond the options excluded

Tips before you start

  • First check whether your area can connect to a priority district heating network.
  • The local design outdoor temperature sets the heat pump's capacity.
  • Outdoor air-water heat pumps must meet noise limits towards neighbours.

Your project in 5 steps

  1. 1. Estimate

    Set a budget range with the estimator.

  2. 2. Grants

    Apply before work starts.

  3. 3. Quotes

    Compare at least 3 quotes.

  4. 4. Permit

    Check with the municipality whether a permit is needed.

  5. 5. Works

    Follow the site and do a written handover.

Grants and subsidies

Canton

Heat pump grant — Buildings Programme

Amount varies by heat pump type and capacity (typically several thousand francs).

Support for replacing fossil or electric heating with a heat pump via the Swiss Buildings Programme and the canton of Vaud.

www.leprogrammebatiments.ch

Check amounts and conditions with the provider before signing: apply before work starts in most cases.

Payerne's housing stock in figures

The federal building register lists 1'529 residential buildings with 5'164 dwellings in Payerne. 58% were built before 1980, before serious insulation standards, and 59% are still heated with oil or gas.

With 59% fossil heating and 20.3% electrically heated hot water, many buildings in Payerne will need a new system. Planning ahead avoids deciding under pressure after a breakdown.

58 %built before 1980
59 %heated by oil or gas
20.3 %electric hot water
13.1 %with declared solar thermal

Age of residential buildings

  • Before 191921 %
  • 1919–194513 %
  • 1946–196010 %
  • 1961–19705 %
  • 1971–19809 %
  • 1981–199010 %
  • 1991–20007 %
  • 2001–20109 %
  • Since 201115 %

Main heating energy

  • Heating oil42 %
  • Heat pump29 %
  • Gas17 %
  • Electricity8 %
  • Wood4 %
  • District heating1 %

Heating and hot water: which energies?

EnergyHeatingHot water
Gas17 %14.1 %
Heating oil42 %41.8 %
District heating1 %0.7 %
Heat pump29 %7.3 %
Electricity8 %20.3 %
Wood4 %2.6 %
Solar thermal0 %13.3 %

Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.

Type of heating system

  • Boiler (unspecified)48.9 %
  • Heat pump28.9 %
  • Standard boiler6.9 %
  • Central electric heating6.3 %
  • Condensing boiler5.3 %
  • Stove2 %
  • Direct electric heaters0.9 %
  • Heat exchanger (district)0.7 %

A standard non-condensing boiler is usually older and less efficient.

Renovations, heritage and volumes

For renovation projects in Payerne, official RegBL data provides vital context. With 51 protected buildings out of 300 known, engaging with the municipality early is essential for handling heritage permit requirements. The median house volume of 795 m3 serves as a key metric for scaling heating and insulation upgrades. Please be aware that volume coverage is partial, with data available for 619 out of 905 houses measured under the SIA 416 standard. As the renovation year is not recorded for these properties, homeowners should focus on the provided heritage and volume indicators to guide their initial budget assessments.

51
buildings flagged as protected
status known for 300 of 1'529 buildings; check with the municipality
795 m³
median house volume (SIA 416)
measured for 619 of 905 houses

Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.

Companies in the area

Bert-Eau AB Sàrl

1530 Payerne · about 0 km

Specialist in sanitary, heating, and ventilation installations with 45 years of experience in Vaud and Geneva.

berteau.ch

Ney SA

1530 Payerne · about 0 km

Ney SA in Payerne carries out sanitary, heating, sheet metal roofing and roof covering work for new builds and renovations, as well as maintenance and repairs.

ney-sa.ch

Caviggia Fabrizio

1530 Payerne · about 0 km

Payerne-based company specializing in plumbing, tinware, and heating, offering renovations, 24/7 repairs, and water heater descaling.

caviggia.ch

Groupe E Connect SA Succursale de Payerne

1530 Payerne · about 0 km

Groupe E Connect provides services for electrical installations, heating systems, and solar photovoltaic solutions.

groupe-e.ch

Suggestions from the commercial register by distance and activity. Not an endorsement or partnership.

Useful local data

Rules of the canton of Vaud

These rules apply across the whole canton, not only in this town.

Tax deductions

  • Note : Le contribuable peut choisir, lors de chaque période fiscale et pour chaque immeuble, entre la déduction des frais effectifs et la déduction forfaitaire. La déduction forfaitaire couvre les frais d'entretien, de remise en état d'immeubles acquis récemment, d'administration par des tiers, d'investissements énergétiques, de démolition et de primes d'assurances.
  • Carry-forward : Si les coûts d'investissement destinés à économiser l'énergie et à ménager l'environnement ou les frais de démolition en vue d'une construction de remplacement ne peuvent pas être entièrement pris en considération fiscalement durant l'année où ils ont été engagés, le solde peut être reporté sur les deux périodes fiscales suivantes. Les dépenses peuvent être reportées si le revenu net est négatif. Si des frais sont reportés, il n'est pas possible de faire valoir une déduction forfaitaire pendant cette période fiscale. En cas de déménagement en Suisse ou de transfert de la propriété de l'immeuble, le contribuable conserve le droit de déduire le solde des frais pouvant être reportés.
  • Maintenance costs : Le contribuable qui possède des immeubles privés peut déduire les frais nécessaires à leur entretien, les primes d'assurances relatives à ces immeubles et les frais d'administration par des tiers.
  • Energy investments : Sont réputés investissements destinés à économiser l'énergie et à ménager l'environnement les frais encourus en vue de rationaliser la consommation d'énergie ou de recourir aux énergies renouvelables. Ces investissements concernent le remplacement d'éléments de construction ou d'installations vétustes et l'adjonction d'éléments de construction ou d'installations dans des bâtiments existants. Si les mesures sont subventionnées par la collectivité publique, le contribuable ne peut déduire que les frais qu'il assume lui-même. Le taux de déduction est de 100%.

Source : Règlement sur la déduction des frais relatifs aux immeubles privés (RDFIP)

Permits

  • Legal basis : LATC et RLATC (BLV 700.11 et 700.11.1)
  • Competent authority : Commune concernée, avec consultation des services cantonaux selon le projet
  • Heat pump : Pour certaines pompes à chaleur desservant un bâtiment existant, une procédure d’annonce est prévue par l’article 68c RLATC, sous conditions. Si les conditions ne sont pas remplies, une procédure de permis de construire est nécessaire. Vérifiez votre cas auprès de la commune.
  • Procedure : La procédure dépend de la nature des travaux et de la situation du bâtiment ; la commune confirme la procédure applicable.

Source : État de Vaud — Permis de construire (LATC / RLATC)