Solar panels · Uster

Solar panels in Uster

Indicative price, tips, grants and companies for your project in Uster (Zurich).
Solar panels – Uster

At a glance

Typical budget
CHF 18'500 – CHF 33'500
Midpoint
CHF 25'300
Grants found
0
Nearby companies
4

Worked examples in Uster

Small project

CHF 10'000 – CHF 18'900

Typical project

CHF 18'500 – CHF 33'500

Large project

CHF 32'000 – CHF 56'800

ProjectQuantityLowHigh
Small project5 kWcCHF 10'000CHF 18'900
Typical project10 kWcCHF 18'500CHF 33'500
Large project18 kWcCHF 32'000CHF 56'800

Computed with our estimator for Uster (regional factor included), standard finish. Only the project size changes.

Cost split (typical project)

  • Labour : CHF 8'800 (35 %)
  • Materials : CHF 13'900 (55 %)
  • Other costs : CHF 2'500 (10 %)

What the price covers

Included

  • Supply and installation
  • VAT
  • Inverter and grid connection

Not included

  • Permits and architect fees
  • Unexpected structural issues
  • Possible subsidies
  • Battery, roof refurbishment and structural reinforcement

Uster's housing stock in figures

In Uster, the federal building register lists 4'976 residential buildings and 17'148 dwellings. These municipal benchmarks help put your home in context, but do not replace an individual assessment.

54 %built before 1980
70 %heated by oil or gas
14.3 %electric hot water
2.9 %with declared solar thermal

Age of residential buildings

54 % built before 1980

  • Before 191915 %
  • 1919–19458 %
  • 1946–196010 %
  • 1961–19707 %
  • 1971–198014 %
  • 1981–199013 %
  • 1991–200014 %
  • 2001–201012 %
  • Since 20117 %

Construction year does not reveal past renovations: check the current insulation condition.

Main heating energy

58 % · Gas

  • Gas58 %
  • Heat pump19 %
  • Heating oil12 %
  • Wood7 %
  • District heating3 %
  • Electricity1 %

This distribution describes recorded buildings, not your system's consumption or efficiency.

Heating and hot water: which energies?

EnergyHeatingHot water
Gas58 %47.7 %
Heating oil12 %11 %
District heating3 %2.2 %
Heat pump19 %17.1 %
Electricity1 %14.3 %
Wood7 %5.1 %
Solar thermal0 %2.4 %

Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.

Type of heating system

  • Boiler (unspecified)70.2 %
  • Heat pump18.9 %
  • Condensing boiler3.8 %
  • Heat exchanger (district)2.6 %
  • Standard boiler2.2 %
  • Stove1.4 %
  • Central electric heating0.5 %

A standard non-condensing boiler is usually older and less efficient.

Houses or apartment buildings?

  • Single-family houses59.2 %
  • Two-dwelling houses7.7 %
  • Apartment buildings (3+)33 %

10 % of buildings mix housing with shops or offices.

The typical building

storeys (median)
3
median footprint
123 m²
median dwelling area
94 m²

Renovations, heritage and volumes

For renovation projects in Uster, RegBL data provides useful benchmarks for planning. With a median building volume of 640 m3, homeowners can better estimate the scale of heating or insulation upgrades. Note that data coverage is partial, as only 40 out of 2948 buildings are measured according to SIA 416 standards. Regarding heritage protection, no protected buildings are recorded among the 376 known entries, though the overall coverage remains limited. We advise you to contact the municipality early to confirm your property status and specific regulatory requirements before finalizing your renovation plans or submitting any permit applications.

0
buildings flagged as protected
status known for 376 of 4'976 buildings; check with the municipality
640 m³
median house volume (SIA 416)
measured for 40 of 2'948 houses

Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.

Tips before you start

  • The federal one-off remuneration (Pronovo) lowers the cost of small systems.
  • Profitability depends mainly on how much power you use on site.
  • A suitably integrated roof system often only needs notification.

Your project in 5 steps

  1. 1. Estimate

    Set a budget range with the estimator.

  2. 2. Grants

    Apply before work starts.

  3. 3. Quotes

    Compare at least 3 quotes.

  4. 4. Permit

    Check with the municipality whether a permit is needed.

  5. 5. Works

    Follow the site and do a written handover.

Grants and subsidies

No specific grant listed for this work. Maintenance tax deductions may still apply.

Companies in the area

Eco6therm Sàrl

2832 Rebeuvelier · about 98.2 km

Eco6therm specializes in the installation of heating systems, particularly heat pumps, and solar photovoltaic energy solutions.

eco6therm.ch

Zbinden & Joye SA successeur Pierre Streit

2740 Moutier · about 102.9 km

Moutier-based company specializing in tinsmithing, roofing, ventilated facades, and solar panel installation.

zbinden-joye.ch

Bernard Monnerat

2740 Moutier · about 102.9 km

Company in Moutier specializing in plumbing, heating (oil, wood, heat pumps), and solar thermal and photovoltaic solutions.

bmonnerat.ch

ADS Construction Sàrl

2800 Delémont · about 104.6 km

Construction and renovation company in Delémont, specializing in masonry, sanitary facilities, heating, and turnkey projects in the Jura region.

adsconstruction.ch

Suggestions from the commercial register by distance and activity. Not an endorsement or partnership.

Works often combined in Uster

Other works in Uster

Solar panels in nearby towns