Home solar battery · Wallisellen

Home solar battery in Wallisellen

Indicative price, tips, grants and companies for your project in Wallisellen (Zurich).
Home solar battery – Wallisellen

At a glance

Typical budget
CHF 8'100 – CHF 17'200
Midpoint
CHF 11'800
Grants found
0
Nearby companies
4

Worked examples in Wallisellen

Small project

CHF 4'400 – CHF 10'200

Typical project

CHF 8'100 – CHF 17'200

Large project

CHF 13'900 – CHF 28'500

ProjectQuantityLowHigh
Small project5 kWhCHF 4'400CHF 10'200
Typical project10 kWhCHF 8'100CHF 17'200
Large project18 kWhCHF 13'900CHF 28'500

Computed with our estimator for Wallisellen (regional factor included), standard finish. Only the project size changes.

Cost split (typical project)

  • Labour : CHF 2'400 (20 %)
  • Materials : CHF 8'200 (70 %)
  • Other costs : CHF 1'200 (10 %)

What the price covers

Included

  • Supply and installation
  • VAT
  • Battery, charge management and standard connection; options according to answers

Not included

  • Permits and architect fees
  • Unexpected structural issues
  • Possible subsidies
  • Solar panels and complete electrical refurbishment

Wallisellen's housing stock in figures

In Wallisellen, the federal building register lists 2'006 residential buildings and 8'510 dwellings. These municipal benchmarks help put your home in context, but do not replace an individual assessment.

64 %built before 1980
68 %heated by oil or gas
17.9 %electric hot water
2.3 %with declared solar thermal

Age of residential buildings

64 % built before 1980

  • Before 19199 %
  • 1919–194516 %
  • 1946–196018 %
  • 1961–19708 %
  • 1971–198013 %
  • 1981–19909 %
  • 1991–20008 %
  • 2001–20108 %
  • Since 201110 %

Construction year does not reveal past renovations: check the current insulation condition.

Main heating energy

46 % · Gas

  • Gas46 %
  • Heating oil22 %
  • Heat pump20 %
  • Electricity5 %
  • District heating4 %
  • Wood3 %

This distribution describes recorded buildings, not your system's consumption or efficiency.

Heating and hot water: which energies?

EnergyHeatingHot water
Gas46 %40.9 %
Heating oil22 %16.5 %
District heating4 %3.3 %
Heat pump20 %16.7 %
Electricity5 %17.9 %
Wood3 %2.5 %
Solar thermal0 %1.9 %

Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.

Type of heating system

  • Boiler (unspecified)66.4 %
  • Heat pump19.9 %
  • Heat exchanger (district)4.1 %
  • Central electric heating3.4 %
  • Stove2.9 %
  • Condensing boiler2 %
  • Direct electric heaters1.1 %

A standard non-condensing boiler is usually older and less efficient.

Houses or apartment buildings?

  • Single-family houses47.6 %
  • Two-dwelling houses7 %
  • Apartment buildings (3+)45.4 %

12.7 % of buildings mix housing with shops or offices.

The typical building

storeys (median)
3
median footprint
150 m²
median dwelling area
90 m²

Renovations, heritage and volumes

For your renovation projects in Wallisellen, official RegBL figures provide essential guidance. With a median building volume of 984 m3 based on the SIA 416 standard, you can better assess the scale of required heating and insulation works, although this measurement is based on 11 out of 955 houses. Furthermore, data regarding heritage protection is partially covered, with the status known for only 325 out of 2006 buildings. We advise contacting the municipality early to confirm your property's status, as local heritage regulations directly impact permit requirements and the scope of work allowed for your renovation.

0
buildings flagged as protected
status known for 325 of 2'006 buildings; check with the municipality
984 m³
median house volume (SIA 416)
measured for 11 of 955 houses

Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.

Tips before you start

  • A battery is worthwhile when solar output clearly exceeds your daytime use.
  • Size capacity by evening consumption, not panel power.
  • Check compatibility with your existing inverter before buying.

Your project in 5 steps

  1. 1. Estimate

    Set a budget range with the estimator.

  2. 2. Grants

    Apply before work starts.

  3. 3. Quotes

    Compare at least 3 quotes.

  4. 4. Permit

    Check with the municipality whether a permit is needed.

  5. 5. Works

    Follow the site and do a written handover.

Grants and subsidies

No specific grant listed for this work. Maintenance tax deductions may still apply.

Companies in the area

Eco6therm Sàrl

2832 Rebeuvelier · about 89.2 km

Eco6therm specializes in the installation of heating systems, particularly heat pumps, and solar photovoltaic energy solutions.

eco6therm.ch

TELEC Renggli S.A. (Télécommunications, Electricité et Commerce)

2735 Malleray · about 100.7 km

Company specialized in electrical installations and telecommunications systems, including network infrastructure and related trade.

telecrengglisa.ch

Solar conseil Sàrl

2605 Sonceboz-Sombeval · about 109.6 km

Solar conseil Sàrl specializes in the installation of photovoltaic power plants, energy storage solutions, and energy efficiency consulting in the Jura and Bernese Jura regions.

solarconseil.ch

HyperSolaire Sàrl

2718 Lajoux JU · about 110.4 km

Jura-based specialist in photovoltaic panel installation and energy storage solutions with AI-driven optimization.

hypersolaire.ch

Suggestions from the commercial register by distance and activity. Not an endorsement or partnership.

Works often combined in Wallisellen

Other works in Wallisellen

Home solar battery in nearby towns