Heat pump installation · Wallisellen

Heat pump installation in Wallisellen

Indicative price, tips, grants and companies for your project in Wallisellen (Zurich).
Heat pump installation – Wallisellen

At a glance

Typical budget
CHF 42'400 – CHF 78'900
Midpoint
CHF 59'300
Grants found
0
Nearby companies
4

Worked examples in Wallisellen

Small project

CHF 33'500 – CHF 61'400

Typical project

CHF 42'400 – CHF 78'900

Large project

CHF 55'600 – CHF 105'200

ProjectQuantityLowHigh
Small project80 m²CHF 33'500CHF 61'400
Typical project160 m²CHF 42'400CHF 78'900
Large project280 m²CHF 55'600CHF 105'200

Computed with our estimator for Wallisellen (regional factor included), standard finish. Only the project size changes.

Cost split (typical project)

  • Labour : CHF 23'700 (40 %)
  • Materials : CHF 29'600 (50 %)
  • Other costs : CHF 5'900 (10 %)

What the price covers

Included

  • Supply and installation
  • VAT
  • Heat pump and standard connections; removal and equipment only according to answers

Not included

  • Permits and architect fees
  • Unexpected structural issues
  • Possible subsidies
  • Drilling beyond 150 m, buried or contaminated tank, asbestos, insulation and new finishes
  • With air-to-air: hot water and ducts only if selected; adaptations beyond the options excluded

Wallisellen's housing stock in figures

In Wallisellen, the federal building register lists 2'006 residential buildings and 8'510 dwellings. These municipal benchmarks help put your home in context, but do not replace an individual assessment.

64 %built before 1980
68 %heated by oil or gas
17.9 %electric hot water
2.3 %with declared solar thermal

Age of residential buildings

64 % built before 1980

  • Before 19199 %
  • 1919–194516 %
  • 1946–196018 %
  • 1961–19708 %
  • 1971–198013 %
  • 1981–19909 %
  • 1991–20008 %
  • 2001–20108 %
  • Since 201110 %

Construction year does not reveal past renovations: check the current insulation condition.

Main heating energy

46 % · Gas

  • Gas46 %
  • Heating oil22 %
  • Heat pump20 %
  • Electricity5 %
  • District heating4 %
  • Wood3 %

This distribution describes recorded buildings, not your system's consumption or efficiency.

Heating and hot water: which energies?

EnergyHeatingHot water
Gas46 %40.9 %
Heating oil22 %16.5 %
District heating4 %3.3 %
Heat pump20 %16.7 %
Electricity5 %17.9 %
Wood3 %2.5 %
Solar thermal0 %1.9 %

Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.

Type of heating system

  • Boiler (unspecified)66.4 %
  • Heat pump19.9 %
  • Heat exchanger (district)4.1 %
  • Central electric heating3.4 %
  • Stove2.9 %
  • Condensing boiler2 %
  • Direct electric heaters1.1 %

A standard non-condensing boiler is usually older and less efficient.

Renovations, heritage and volumes

For your renovation projects in Wallisellen, official RegBL figures provide essential guidance. With a median building volume of 984 m3 based on the SIA 416 standard, you can better assess the scale of required heating and insulation works, although this measurement is based on 11 out of 955 houses. Furthermore, data regarding heritage protection is partially covered, with the status known for only 325 out of 2006 buildings. We advise contacting the municipality early to confirm your property's status, as local heritage regulations directly impact permit requirements and the scope of work allowed for your renovation.

0
buildings flagged as protected
status known for 325 of 2'006 buildings; check with the municipality
984 m³
median house volume (SIA 416)
measured for 11 of 955 houses

Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.

Tips before you start

  • First check whether your area can connect to a priority district heating network.
  • The local design outdoor temperature sets the heat pump's capacity.
  • Outdoor air-water heat pumps must meet noise limits towards neighbours.

Your project in 5 steps

  1. 1. Estimate

    Set a budget range with the estimator.

  2. 2. Grants

    Apply before work starts.

  3. 3. Quotes

    Compare at least 3 quotes.

  4. 4. Permit

    Check with the municipality whether a permit is needed.

  5. 5. Works

    Follow the site and do a written handover.

Grants and subsidies

No specific grant listed for this work. Maintenance tax deductions may still apply.

Companies in the area

F. Imeri Sàrl

2829 Vermes · about 84.3 km

The website presented under the name Imeri Chauffage et Sanitaire Sàrl offers plumbing, heating and solar thermal work, while F. Imeri Sàrl’s registered purpose refers to a scrap metal business.

imeri-sarl.ch

Sanit & Bilat Fils S.A.

2824 Vicques · about 88.2 km

Specialist since 1968 in sanitary installations, heating (gas, oil, wood, renewable energy), and tinsmithing with 24/7 emergency repair service.

sanit.ch

Buchwalder Sàrl

2824 Vicques · about 88.2 km

Buchwalder Sàrl in Vicques has specialized in the installation, repair, and renovation of heating and sanitary systems since 1966.

buchwalder-sarl.ch

Gyger Haustechnik

2824 Vicques · about 88.2 km

Gyger Haustechnik specializes in sanitary installations, heating systems, bathroom renovations, and tiling work.

gyger-co.ch

Suggestions from the commercial register by distance and activity. Not an endorsement or partnership.

Works often combined in Wallisellen

Other works in Wallisellen

Heat pump installation in nearby towns